Blockage Bridge Ouderkerk: Rearranging Of The Start And Finish Areas

Blockage Bridge Ouderkerk: Rearranging Of The Start And Finish Areas

  • 2023 , All
  • March 6, 2023
  • Alex Rutten
  • Due to construction works on the Bridge in Ouderkerk, there is no passage possible under the bridge during the weekend of the Head of the River. Because of this, the start of the race has been moved in the direction of Amsterdam.

    There are some consequences for both racing and warming up towards the start:

    • Always listen to the umpire in the start area.
    • All crews need to turn before the Bridge in Ouderkerk.
    • After passing the Rozenoord bridge, crews will wamr up in numbered order.
    • Keep an eye on your passing time of the Rozenoord bridge, which is printed on your crew numbers. (It has been shorted compared to other years)

    Besides a change of the start location, this year also the finish has been moved, towards rowing club De Hoop. (~150m closer to the start)

    Advice to Coxwains: Please take a look at the Coxwain and Overtaking instruction on the website.

Related posts

images/nieuws/base/1920_web_logo.png

Head Of The River Amstel 2023: Once Again One Big Rowing Festival

We look back on a wonderful Head of the River Amstel, March 11-12, 2023

Read more
images/nieuws/2026/onvergetelijk2026.jpeg

An unforgettable edition of the Head of the River Amstel 2026! 🎉

With pride, we look back on a wonderful race, full of passion, sportsmanship, and unforgettable moments.

Read more
images/nieuws/2026/head_eten_vrijdag.jpg

Join us for a special dinner on Friday evening, March 6st, 2026!

The Head of the River is not only about rowing, but also about enjoying good food and drinks together.

Read more